Hello All<br><br>I am increasingly surprised at the enthusiasm that can cause scheduling bug (2010 problem) and bug 57 (<a href="http://tracker.nagios.org/view.php?id=57">http://tracker.nagios.org/view.php?id=57</a>).<br>
<br>It is rather problematic to see a scheduler doing a break until
2010 at the same date that the next check because we do not monitor
24/24 7/7 ... If we do not have eyes on the screen, we are not warned
... less well to do even on a patch-based cron.<br>
<br>Nobody is impacted by this problem? I see a lot of minor bugs on
the mailing list and I think this bug have the most impact. If a
scheduler stop to schedule, it loses some of its interest ... And more
over, it loses credibility.<br>
<br>This is a bug which is known since several months, and I just think it should be fixed in urgence. I know we tried to solve a short time ago
without success.<br><br>What do you think about that ?<br><font color="#888888"><br><span style="color: rgb(0, 0, 0);">Regards,</span><br style="color: rgb(0, 0, 0);" clear="all"><span style="color: rgb(0, 0, 0);">--</span><br style="color: rgb(0, 0, 0);">

<span style="color: rgb(0, 0, 0);">
Julien MATHIS | CTO</span><br style="color: rgb(0, 0, 0);"><br style="color: rgb(0, 0, 0);"><a style="color: rgb(0, 0, 0);" href="mailto:jmathis@merethis.com" target="_blank">jmathis@merethis.com</a><br style="color: rgb(0, 0, 0);">

<br style="color: rgb(0, 0, 0);"><span style="color: rgb(0, 0, 0);">MERETHIS is editor of Centreon.</span></font>